More framing. We moved the camera to a different location to catch more of the side of the structure. Roof trusses are nearly complete. Notice the Tyvek vapor barrier installation. Getting pretty close to drying-in the entire structure.
Month: March 2017
Framing Part 2
Not to overdo it, but more framing. We adjusted the camera to aim slightly higher. You can see lots of action on the second floor. We are using 1 1/4 inch sub-floor on the second story, which is really solid to walk on. Good weather and good progress.
Framing Part 1
We are now starting to make some real progress, with the start of framing. The exterior walls are all 2×6 lumber set on 16 inch centers, to provide strong support for the second story, and better insulation. Foundation plate sill is pressure treated, and tied to the foundation with anchor bolts. Weather has not been cooperating, it has been wet and that has slowed us down a bit, but the framing crew works pretty much other than when it is pouring. This video is a tad long, but bear with us, you can get a real sense of the progress now, and we have been awaiting this for many weeks.