Construction Complete, Inspections Passed and Certificate of Occupancy

Construction Complete

After a few glitches with the final inspections, we now have our certificate of occupancy, so can move in some furniture. There remain a few finish-out details, but it’s now legal for us to occupy the house. Here are some pictures.

[ngg_images source=”galleries” container_ids=”4″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”2″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]

Firepit Construction

Firepit Details

Here are some pictures from the construction of our firepit. The pit is about 30 inches inside diameter and 56 inches outside. It is set on a concrete base, has a fire brick lined interior, limestone exterior, and flat stone top. The gas ring is stainless steel, set on a stainless pan and connected underground to our natural gas line from the house. There is an access door on the side of the pit, where a traditional gas key and valve control the gas flow. We also have a locking valve on the gas line near the house to cut off the flow when we are out of town.

We used three bags of 30 pound rain forest black (actually grey) lava pebbles which were “tumbled” to create a smoother finish, for a total of 90 pounds.  I may add another bag or two.  

[ngg_images source=”galleries” container_ids=”3″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”2″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”0″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]

 

 

 

Concrete Pour – Driveway

Here are some photos of the concrete pour for the driveway, front walk and firepit area. Note our contractor installed PVC pipe runs under the driveway and front walk to accommodate later installed irrigation pipes and cable. Nice to plan ahead for those items.

[ngg_images source=”galleries” container_ids=”1″ display_type=”photocrati-nextgen_basic_thumbnails” override_thumbnail_settings=”0″ thumbnail_width=”240″ thumbnail_height=”160″ thumbnail_crop=”1″ images_per_page=”20″ number_of_columns=”2″ ajax_pagination=”0″ show_all_in_lightbox=”0″ use_imagebrowser_effect=”0″ show_slideshow_link=”1″ slideshow_link_text=”[Show slideshow]” order_by=”sortorder” order_direction=”ASC” returns=”included” maximum_entity_count=”500″]